Other CAPEX Requirements

Power backup

Backup sizing starts with the load to be carried and how long it must run. Generators, inverters, solar panels and battery banks play different roles: continuous standby, short bridging or generation. Specify the load in kVA or kW, single or three phase, hours of autonomy, fuel type, battery chemistry, available space and ventilation, and any noise limit. Installation, changeover wiring and earthing (IS 3043; check the current edition) are for licensed electricians.

Products in Power backup

Related in Other CAPEX Requirements

LET’S MAKE IT HAPPEN

Need power backup?

Share the specification and quantity. We’ll confirm what we can supply and respond within one business day.